Control your battery from the Energy Map
Open Battery plan from the Energy Map. Use recommended Quick actions for a protected temporary override, or edit the detailed plan for several changes. Compare web and mobile steps side by side.
Reviewed
Start on the Energy Map and select your Battery to open Battery plan. You have two ways to take manual control: Quick actions (temporary override) for an immediate timed action, or edit the detailed plan when you need several changes or time periods.
1. Start at the Energy Map
Open Battery plan
Select Energy map
Use the app navigation; on mobile, Energy map is the home icon at the bottom left. Check that you are viewing the household you want to control.
Select your Battery
Tap or click the battery illustration or its status label. In these examples it is on the left, below the house. Your layout and live readings may differ. Select either screenshot to enlarge it.
Check the connected system
Battery plan opens for your connected system. Check the system name and connection status. The Energy map link at the top takes you back.
2. Choose one of two manual-control options
- Option 1 — Quick actions (recommended temporary override): use Change now → Charge, Discharge or Self use for one immediate action with a countdown.
- Option 2 — Edit the detailed plan: use Your plan → Edit period / Add period when you need more than one change, several time windows or supported settings for individual periods. Review all changes and apply them together.
Option 1 — Quick actions: temporary override
Open Change now and choose an action
Charge requests charging from now. Discharge requests a temporary export of stored battery energy. Self use requests using solar and battery energy for the home. Available actions depend on your connected system.
Review the limits and choose a duration
The action sheet shows the applicable target or reserve and maximum power. Choose 30, 60, 90 or 120 minutes. This creates an unsaved draft; the action starts when applied.
Review the draft
Check the temporary action and the periods that follow it. Use Discard if you change your mind before applying.
Apply and confirm
Select Apply plan, then Confirm and apply in Review complete plan. Check the complete replacement schedule before confirming. Once active, the temporary override stays protected from automatic replanning for its countdown.
Example: charge for one hour. Select Change now → Charge → 60 minutes → Apply plan → Confirm and apply, reviewing the draft before confirming. The countdown sets the duration; it does not guarantee a particular charge level or electricity cost.
Until the countdown ends or you stop it: a new automatic plan will not replace the active temporary override. To finish early, use Stop and restore plan. Otherwise, the saved plan is scheduled to resume when the temporary action ends.
Option 2 — Edit the detailed plan for several changes
Open a period or add one
In Your plan, select a timeline window, period row or pencil icon to open Edit period. Use Show all periods for the full list or Add period for another window. On mobile, the editor opens as a sheet.
Set the action, start and end
Choose a supported Battery action and set Start and End. Use Ends at midnight when appropriate. Resolve overlaps and validation messages.
Review the settings for that period
Check the 30-minute Buy and Sell prices. Where supported, review Grid reserve, Charge to or Discharge to, power and Maximum SoC. Use only the fields provided for your connected system.
Review change, then repeat for the next period
Select Review change to add the period to your draft. On mobile, scroll to the bottom of the editor. Repeat for each period you want to change or add, then check the complete timeline.
Apply all reviewed changes together
Select Apply plan, then Confirm and apply. A new automatic plan can later overwrite these detailed-plan edits. If the plan changed while you were editing, discard the stale draft, reload and make your changes again.
3. Check your battery’s response
- Open Delivery details. A saved plan, sent command, acknowledgement and device confirmation describe different stages. Review the status and any explanation.
- Check measured readings. Watch battery power and charge level, allowing for the displayed update time. Live, Scheduled now and Next scheduled change do not by themselves confirm the physical result.
- After the temporary action ends: check delivery and measured behaviour again. You can use Stop and restore plan to end it before the countdown finishes.
Manual control and Full Automation
Editing a period or selecting Self use does not switch Full Automation off. For a short-term override, use Quick actions under Change now. For ongoing manual control, use the operating-mode control above Your plan to review the Intelligence settings first.
If a page or control is unavailable
- Check access: Free access keeps the Energy Map read-only. Device details and controls depend on your subscription and household permissions; demo and viewer accounts cannot send live commands.
- Check the connection: confirm the battery is connected and read any connection notice. Some actions or settings may not be supported by your inverter.
- Read the message: validation errors, unsaved conflicts or an uncertain previous command can block another change. Follow the displayed recovery guidance before trying again.